By TCN Staff Reporter,
Lucknow: The Lucknow Bench of the Allahabad High Court has permitted Commissioner, Faizabad to replace the tarpaulin, polythene sheets and ropes over the makeshift structure by a new one of the same size and quality and in the same manner as they were already being used. The exercise shall be carried out without any further delay.
The Special full bench comprising Justices SU Khan, Sudhir Agarwal and VK Dixit granted the permission on the application filed by the Commissioner, Faizabad on the report dated 11.04.2002 of Executive Engineer, PWD, Faizabad. As per the report, the tarpaulin and polythene sheet is torn from several places and there is a need to replace it. Similar directions had also been issued on 24 March 2009 when no counsel raised any objections.